Re: LOCATING FEEDWATER TREATMENT INLET


[ Follow Ups ] [ Post Followup ] [ Boilerroom.com Steam-Forum - Number 2 ] [ FAQ ]

Posted by Raymond De Ravet on May 08, 2001 at 11:01:43:

In Reply to: LOCATING FEEDWATER TREATMENT INLET posted by MIKE on May 06, 2001 at 15:19:20:

: I AM GOING TO BE INSTALLING FEEDWATER TREATMENT LINES TO 3 LOW PRESSURE BOILERS I AM GOING TO TAP INTO THE FEEDWATER LINE ADD A BALL VALVE, CHECK VALVE, THEN A CONNECTOR TO ACCEPT THE POLY TUBING THAT GOES BACKTO A PORPORTIONAL PUMP TO DELIVER THE CHEMICALS TO THE BOILERS WHAT DO YOU THINK, AM I MISSING ANYTHING?

Mike,
You need to disperse the chemicals in to the feed water. Therefor you need a dispersing systeem at the injection point. Consult your chemical vendor about it.
Raymond




Follow Ups:



Post a Followup

Name:
E-Mail:

Subject:

Comments:


[ Follow Ups ] [ Post Followup ] [ Boilerroom.com Steam-Forum - Number 2 ] [ FAQ ]