Posted by MIKE on May 06, 2001 at 15:19:20:
I AM GOING TO BE INSTALLING FEEDWATER TREATMENT LINES TO 3 LOW PRESSURE BOILERS I AM GOING TO TAP INTO THE FEEDWATER LINE ADD A BALL VALVE, CHECK VALVE, THEN A CONNECTOR TO ACCEPT THE POLY TUBING THAT GOES BACKTO A PORPORTIONAL PUMP TO DELIVER THE CHEMICALS TO THE BOILERS WHAT DO YOU THINK, AM I MISSING ANYTHING?