These diagrams are for general information only. Consult Boilerroom.com
for individual, detailed installation instructions.
Economizer installation for dearated boiler feedwater. Unit design specifics:
Carbon steel economizer tubes and fins should be adequate for continuous operation boiler Upgrade to Duplex stainless steel tubes and stainless steel fins may be required
for cycling boiler operations
Installation adequate for natural gas firing and #2 oil firing
Economizer Installation for Deaerated Feedwater Entering Boiler
Utilizing an On/Off Boiler Feedwater System:
During feedpump ON operation, the feedpump sends the feedwater through
the economizer and into the boiler.
When the feedpump shuts OFF, the small circulation pump
starts and circulates water in the closed piping loop to maintain flow in the economizer to avoid a
stagnant flow situation. A stagnant flow situation will lead to economizer
steaming and hammering, possibly leading to economizer and boiler damage.
The check valves on the boiler inlet and the feedpump discharge
keeps the water flow in the new loop.
When the feedpump goes back into an ON condition, the water in the circulation
loop is flushed into the boiler, maintaining heat recovery at ALL operating
conditions.
Contact factory for circulation line size and length and circulation pump selection requirements.