Boilerroom.com

These diagrams are for general information only.
Consult Boilerroom.com for individual, detailed installation instructions.


Economizer installation for non-dearated boiler feedwater. Unit design specifics:

  • Duplex stainless steel economizer tubes with stainless steel fins are required due to dissolved oxygen in the water.
    Upgrade to Duplex stainless steel required to prevent against chloride stress corrosion cracking of any 300 series stainless steel tube.
  • Installation adequate for natural gas firing and #2 oil firing
  • Any economizer that is installed in a possible condensing application MUST be designed with provisions in the lower transition to collect and drain all condensation from the stack, preventing it from entering and damaging the boiler.
  • Economizer Installation for Non-Deaerated Feedwater Entering Boiler
    Utilizing Continuous Running Feedpumps with Modulating Feedvalve:

    Return to Economizer Installation Main Page

    On-Line Economizer Proposal Request Form


    Information on Boilerroom.com