[an error occurred while processing this directive]
Posted by Dammitboy on December 21, 2005 at 22:23:38:
In Reply to: New Boiler Boil Out Procedure posted by Mike Boyle on November 08, 2005 at 11:05:59:
:If you are boiling out a new boiler or a used boiler that has benn setting for a while all you really need is Tide. 96 oz. liquid tide in your boiler. Fire and heat until 40-50 psi blowdown intermittently until pressure is 20 psi. Cool, drain and flush. Fill and operate. Ensure your chemical man has a program set up for your boiler. All a boil out needs to do is remove oil, rust, millings. Most all the rest can be removed during operation with cooperation from your chem. man and regular blowdown.