Modify cost vs. boiler replacement


[ Follow Ups ] [ Post Followup ] [ Boilerroom.com Steam-Forum - Number 4 ] [ FAQ ]

Posted by Leon on December 09, 2013 at 10:05:20:

What is the estimated cost for the following modification? Increasing the steam outlet/orifice size of a 70hp industrial boiler. The reason for this: the boiler was originally manufactured for 150 operating psi with a 2.5" orifice. But now the boiler operates at 50 psi (for processing reasons) which created a carryover condition. The manufacturer recommends that the orifice size needs to be increased to 4" or purchase a new boiler.