[an error occurred while processing this directive]
Posted by Leon on December 09, 2013 at 09:36:44:
What is the estimated cost for the following modification? Increasing the orifice size of a 70hp industrial boiler. The reason for this: the boiler was originally manufactured for 150 operating psi with a 2.5" orifice. But now the boiler operates at 50 psi (for processing reasons)which created a carryover condition. The manufacturer recommends that the orifice size needs to be increased to 4" or purchase a new boiler.