Posted by Wayne on November 13, 2008 at 16:50:24:
We experience short cycling of our two Miura boilers due to a wide load variation. One of the problems we hope to aleviate is the lag boiler of the two cycling on when it's pressure drops. We intend to add a balance tube 3/4" before the check/main valves, keeping the lag boiler at operating pressure so it does not run unless the header pressure calls for it. Our questions are? Will we be creating condensate or carry over issues? Is there a code issue? Any input is welcome.
Thanks,
Wayne