[an error occurred while processing this directive]
Posted by Joe on May 19, 2004 at 09:38:53:
In Reply to: Re: To Big To small posted by LowBottom on May 19, 2004 at 05:02:11:
The new rads may not have been sized correctly to the original riser piping and boiler size. You might want to investigate if the right size air vent was used. Rads far from the boiler need longer vent time to allow for air to purge and steam to fill the rad.